Slab on ground
A garage, extension or house floor with a defined slab area, edge details and floor level.
Concrete & foundations · New Zealand
Turn a measured concrete volume into whole bags using product-specific wet yield.
10 litres of wet concrete per selected bag
Enter supplier rates in the units shown. Add labour and delivery only if you want them included.
Cemix Multicrete 20 kg bags
Approximately 10 L mixed yield per bag. Retail bagged concrete, not ready-mix or an installed concrete price.
NZ$11.24 / bag · Includes GST · checked 2026-11-10
20 kg bag. Retailer approximate mixed yield 0.01 m³/20 kg bag; 100bags/m³ before waste. Product extract without store shows 9.55, Hamilton South extract 11.24. Price and yield are small-bag concrete only, not delivered ready-mix.
Including GST · 1 of 1 material lines priced
Pour length: 10 m · Pour width: 5 m · Concrete depth: 100 mm
525 bags · 10 litres of wet concrete per selected bag
Round up(volume in litres ÷ wet litres per bag)
Compare the purchase unit and the scope beside each price. Named retail products are supply only. A contractor benchmark applies to the work and location stated.
| Type | Quote unit | Named product price | Regional benchmark |
|---|---|---|---|
| Slab on ground | m³ of concrete / m² of installed slab | Quote requiredSpecify mix strength, slump, site requirements and load size. GST not confirmed.Firth Certified Ready Mixed Concrete ↗2026-11-10 | NZ$110–130 / m²Auckland · Excludes GST |
| Strip or trench footing | m³ of concrete / linear metre | Ask for a supplier quote | Ask for a local quote |
| Pad or pier footings | each / m³ of concrete | NZ$11.24 / bag20 kg bag. Includes GST.Cemix Multicrete 20 kg ↗2026-11-10 | Ask for a local quote |
| Ribbed or waffle slab | m² of slab / designed component schedule | Ask for a supplier quote | Ask for a local quote |
Published rates cover named jobs or products in the areas shown. Match the scope before using a local figure.
| Region | Price in NZD | What the price covers | Source |
|---|---|---|---|
| Northland | Quote required | Ask for availability and a measured rate delivered to your postcode. | |
| Auckland | NZ$110–130 / m²Excludes GST | Slab on groundPlanning range for a 100–150 mm non-structural floor on a prepared pad. Includes placing, concrete, mesh and polythene. Structural foundation and groundworks are separate scopes. | Auckland Concrete Driveways ↗Checked 2026-11-17 |
| Auckland | NZ$430 / jobGST not confirmed | Concrete pump minimum exampleOn-site flat rate for under 2 hours, under 50 m of hose and under 5 m³ pumped. Concrete supply is separate. | MaxPump ↗Checked 2026-11-17 |
| Waikato | Quote required | Ask for availability and a measured rate delivered to your postcode. | |
| Bay of Plenty | Quote required | Ask for availability and a measured rate delivered to your postcode. | |
| Wellington | Quote required | Ask for availability and a measured rate delivered to your postcode. | |
| Canterbury | Quote required | Ask for availability and a measured rate delivered to your postcode. | |
| Otago / Southland | Quote required | Ask for availability and a measured rate delivered to your postcode. | |
| Other NZ regions | Quote required | Ask for availability and a measured rate delivered to your postcode. | |
For any option absent in a region, ask for an itemised local quote. Supply, labour, access and GST can be quoted on different bases.

A garage, extension or house floor with a defined slab area, edge details and floor level.

Continuous support below a wall line where footing dimensions are specified on the drawings.

Discrete loads under columns, deck posts or beams where the designed supports fit the site.

A specified foundation system with ribs and void formers that support a floor build-up.
Turn a measured concrete volume into whole bags using product-specific wet yield. The input specification defines the quantity being measured; separate work needs its own schedule.
Review the displayed formula and match the inputs to the product or drawing. Check whole-unit rounding and the actual cut layout before ordering. This is a material takeoff. Member sizes, spans, reinforcing, foundations, connections and structural suitability must come from the project design.